top of page

Can I Get Hardscaping Installation in Austin? Yes — But Build It Drainage-First

jscotthart
Sep 2
3 min read

Yes — hardscaping installation is widely available in Austin, from patios and walkways to retaining walls and outdoor living areas. The real question is who should build it. Every square foot of hardscape changes how water moves across your property: it stops soaking in and starts running somewhere. Hire a crew that only thinks about pavers, and "somewhere" is usually your foundation, your neighbor's yard, or a puddle in the middle of the new patio. Scott Lockhart Drainage Contractor builds hardscape the other way around — drainage first, surface second — so the beautiful part stays beautiful.

We've been managing water across Austin and Central Texas since 1984, with more than 10,000 completed projects. Hardscape is where that experience becomes something you can see.


Why Hardscape and Drainage Are the Same Project


Rain that used to disappear into a lawn now sheets off stone and concrete. On Central Texas clay — which absorbs slowly and swells when it finally does — that redirected water piles up fast. The most common hardscape failures we're called to fix were drainage failures on day one:

  • Patios poured flat or back-pitched, sending water toward the house instead of away

  • Retaining walls built without drainage behind them — trapped water pushes walls over; weep holes, gravel backfill, and a drain line keep them standing

  • Walkways that dam natural flow paths, turning yards into ponds

  • New hardscape with nowhere for roof runoff to go, so gutters discharge straight onto stone and then straight to the slab


Hardscaping We Install


  • Patios and outdoor living areas — sloped and drained so they're usable the morning after a storm

  • Retaining walls — drainage structures first, landscape features second

  • Walkways and steps — routed with the water, not against it

  • Dry creek beds and channel drains — hardscape that is the drainage, moving runoff visibly and attractively

  • Grading and site prep — the invisible work that makes everything above it last

Every installation ties into the property's larger drainage system — often paired with a French drain collecting what the surface can't shed.


What Drainage-First Hardscape Looks Like


Before stone is ever set, we read the property: where water enters, where it collects, where it needs to exit. Slopes are set so every hard surface sheds away from structures. Base material is compacted and drained so freeze-thaw and clay movement don't heave the surface. Runoff from roofs and high ground gets a dedicated path around — not under — the new work. Then the surface goes down, and it stays down.

The Austin Factor


Hill Country storms drop a lot of water in a hurry, and our clay makes sure it stays on the surface long enough to cause trouble. Hardscape built for this climate treats every storm as a design input. That's also why hardscape from a drainage contractor tends to outlast hardscape from a landscaper: the failure mode was designed out before the first stone was placed.

Start With the Water


If you're planning a patio, wall, or walkway — or you have hardscape that ponds, heaves, or sends water the wrong way — start with a property walk-through and a straight answer about what the water is doing.

Call Scott directly for a free consultation: 512-790-8564 Scott Lockhart Drainage Contractor — hardscaping and drainage across Austin, Dripping Springs, Wimberley, Kerrville, and Fredericksburg since 1984.

© 2026 Scott Lockhart Drainage Contractor.  Licensed Right of Way Contractor — City of Austin

  • Linkedin
  • Youtube
  • TikTok
  • Instagram
  • Facebook

Stay Connected with Us

bottom of page